East Deep Well Ranch Road
Eloy, AZ · Pinal County County
Industrial (Building) with 320.02 acres in Eloy, AZ.
Property overview
- Acreage
- 320.02 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Zoning code
- 20, 10
- Zoning · Municipality
- Eloy
- Transportation · Rail access
- no
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 9.010 miles
- Transportation · Nearest highway
- US 60
- Transportation · Distance to highway
- 52.110 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 49.220 miles
- Transportation · Nearest airport
- Coolidge Muni (P08)
- Transportation · Distance to airport
- 26.128 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Arizona Public Service Company (Phoenix, AZ)
- Utilities · Distance to power line
- 3.730 miles
- Utilities · Distance to substation
- 5.880 miles
- Utilities · Water available
- Yes
- Utilities · Water service
- well, private
- Utilities · Water provider
- Picacho Peak Land & Cattle Llc
- Utilities · Distance to water service
- 0.000 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- not_available
- Utilities · Distance to fiber
- 10.150 miles
- Environmental · Flood zone
- A
- Environmental · Inside 500-year floodplain
- Yes
- Environmental · Wetlands
- no
This site combines a large, operational industrial footprint with on-site utilities, making it a move-in-ready option for heavy users. Multiple APS distribution poles cross the parcel, an exempt domestic well and retention ponds are in place, and paved public access runs to existing paved and gravel internal roads. The northern half already hosts buildings and graded areas tied to an industrial use permit and EPA facility records, while the southern half remains undeveloped desert.
Zoned for industrial use with entitlements and local tax incentives, the site suits waste management, industrial processing, and agricultural support operations. Existing permits and infrastructure support rapid occupancy or phased expansion.