← Back to properties
Building Contact for availability

9065 North White and Parker Road 1

Stanfield, AZ · Pinal County County

Industrial (Building) with 11.99 acres in Stanfield, AZ.

Property overview

Acreage
11.99 acres
Availability
Contact for availability
Zoning · General zoning
industrial
Zoning · Inside city limits
Yes
Zoning · Municipality
Stanfield
Transportation · Rail access
no
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Gila Subdivision
Transportation · Distance to rail
3.420 miles
Transportation · Nearest highway
AZ 202 LOOP
Transportation · Distance to highway
28.730 miles
Transportation · Nearest interstate
I 8
Transportation · Distance to interstate
13.550 miles
Transportation · Nearest airport
Ak-Chin Rgnl (A39)
Transportation · Distance to airport
8.998 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Electrical Dist No2 Pinal County (AZ)
Utilities · Distance to power line
0.030 miles
Utilities · Distance to substation
0.050 miles
Utilities · Water provider
Arizona Water Company (AZ)
Utilities · Distance to water service
29884.800 feet
Utilities · Wastewater provider
Pinal County Maricopa Hud Wwtp (AZ)
Utilities · Natural gas provider
El Paso Natural Gas Co (AZ)
Utilities · Distance to natural gas service
14678.400 feet
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Utilities · Distance to fiber
3.620 miles
Environmental · Flood zone
X
Environmental · Wetlands
no

This site’s biggest advantage is direct access to high‑voltage transmission and adjacent substations, making it rare and ready for energy‑intensive users or utility operators. The parcel is flat, fully developed as an electrical substation with existing utility infrastructure, paved/slabbed surfaces, and cleared surrounds, so major site preparation is limited.

Zoned industrial and located inside Stanfield city limits, the property also qualifies for multiple federal and state incentive zones including HUBZone, NMTC, and BEA. It fits utilities, power partners, energy users, and industrial support operations that need immediate high‑voltage connectivity and a fast path to deployment.

Location