40034 W Clayton Rd Maricopa, AZ 85138 1
Maricopa, AZ · Pinal County County
Industrial (Building) in Maricopa, AZ.
Property overview
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Municipality
- Maricopa
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 7.850 miles
- Transportation · Nearest highway
- AZ 202 LOOP
- Transportation · Distance to highway
- 34.770 miles
- Transportation · Nearest interstate
- I 8
- Transportation · Distance to interstate
- 12.810 miles
- Transportation · Nearest airport
- Ak-Chin Rgnl (A39)
- Transportation · Distance to airport
- 16.857 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Electrical Dist No2 Pinal County (AZ)
- Utilities · Distance to power line
- 0.740 miles
- Utilities · Water available
- Yes
- Utilities · Water service
- well
- Utilities · Water provider
- Az Water Co - Stanfield (Water Provider - Phoenix, AZ)
- Utilities · Distance to water service
- 0.000 feet
- Utilities · Wastewater provider
- Pinal County Maricopa Hud Wwtp (AZ)
- Utilities · Natural gas provider
- El Paso Natural Gas Co (AZ)
- Utilities · Distance to natural gas service
- 14678.400 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- not_available
- Utilities · Distance to fiber
- 2.390 miles
- Environmental · Flood zone
- X
- Environmental · Inside 100-year floodplain
- No
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
Located in the West Pinal growth area, this industrial-zoned parcel combines development potential with multiple federal and regional incentives, including HUBZone and New Markets Tax Credit eligibility. The site sits in a designated impact fee area and is mapped within local irrigation and flood control overlays, giving clear context for planning and permitting.
Best for ag-based manufacturing, food processing, or supplier operations that value water access and rural logistics, the parcel includes an on-site permitted well and canal access, and sits within reach of interstate corridors, rail heads, and regional airports. Flood risk is minimal, and the site is positioned for development in a pro-growth corridor.