32927 West Highway 84
Stanfield, AZ · Pinal County County
Industrial (Building) with 100.16 acres in Stanfield, AZ.
Property overview
- Acreage
- 100.16 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Stanfield
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 5.660 miles
- Transportation · Nearest airport
- Ak-Chin Rgnl (A39)
- Transportation · Distance to airport
- 10.445 miles
- Utilities · Electricity available
- Yes
- Utilities · Distance to power line
- 1.000 miles
- Utilities · Distance to substation
- 1.020 miles
- Utilities · Water available
- Yes
- Utilities · Water service
- well
- Utilities · Water provider
- Francisco Grande Utility Company
- Utilities · Distance to water service
- 0.000 feet
- Utilities · Wastewater available
- Yes
- Utilities · Wastewater service
- private
- Utilities · Wastewater provider
- Francisco Grande Utility Company
- Utilities · Natural gas available
- No
- Utilities · Natural gas provider
- El Paso Natural Gas Co (AZ)
- Utilities · Distance to natural gas service
- 20644.800 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- available
- Utilities · Distance to fiber
- 9.230 miles
- Environmental · Flood zone
- AO
- Environmental · Inside 100-year floodplain
- Yes
- Environmental · Inside 500-year floodplain
- Yes
- Environmental · Wetlands
- no
An existing, move-in-capable agricultural complex anchors this industrial-zoned site, with a large on-site building, an irrigation well, and maintained paved road frontage that support continued farming or conversion to industrial use. The property sits in city limits with sandy loam soils and good surface drainage, reducing site-prep for many types of development.
This location suits agricultural processors, food and beverage operations, light manufacturing, or suppliers seeking easy local access and utility continuity. Entitlements and multiple federal incentive designations, including HUBZone and New Markets Tax Credit eligibility, help lower development cost and speed decisions.