32927 Arizona Highway 84
Stanfield, AZ · Pinal County County
Industrial (Building) in Stanfield, AZ.
Property overview
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Stanfield
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 5.810 miles
- Transportation · Nearest airport
- Ak-Chin Rgnl (A39)
- Transportation · Distance to airport
- 10.309 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Electrical District 4
- Utilities · Distance to power line
- 0.750 miles
- Utilities · Distance to substation
- 0.780 miles
- Utilities · Water provider
- Francisco Grande Utility Company
- Utilities · Distance to water service
- 10771.200 feet
- Utilities · Wastewater provider
- Francisco Grande Utility Company
- Utilities · Natural gas provider
- El Paso Natural Gas Co (AZ)
- Utilities · Distance to natural gas service
- 20644.800 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- available
- Utilities · Distance to fiber
- 8.920 miles
- Environmental · Flood zone
- A
- Environmental · Inside 100-year floodplain
- Yes
- Environmental · Inside 500-year floodplain
- Yes
- Environmental · Wetlands
- no
Located on Highway 84 in Stanfield, this industrial-zoned property sits in the West Pinal growth area with direct highway frontage and quick regional access to Interstate 8, making it well positioned for distribution, light manufacturing, or supplier operations. The parcel is in city limits, has an existing building and developed site utilities nearby, and sits within multiple incentive zones including New Markets Tax Credit and 48C-eligible census tracts, which can lower project costs.
The site’s current use is agricultural and it includes a pond and a small palustrine wetland, and mapping shows FEMA flood zones A and AO plus PM-10 nonattainment designation for the area, so flood mitigation and air permitting are important early considerations.