22316 S Harmon Rd Florence, AZ 85132 1
Eloy, AZ · Pinal County County
Industrial (Building) with 498.94 acres in Eloy, AZ.
Property overview
- Acreage
- 498.94 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Municipality
- Eloy
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 6.040 miles
- Transportation · Nearest highway
- AZ 202 LOOP
- Transportation · Distance to highway
- 75.160 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 14.690 miles
- Transportation · Nearest airport
- Pinal Airpark (MZJ)
- Transportation · Distance to airport
- 18.863 miles
- Utilities · Electricity available
- Yes
- Utilities · Distance to power line
- 1.490 miles
- Utilities · Distance to substation
- 6.540 miles
- Utilities · Water available
- Yes
- Utilities · Water service
- well, private
- Utilities · Distance to water service
- 0.000 feet
- Utilities · Wastewater provider
- Pinal County Eleven Mile Corner Rd Wwtp
- Utilities · Fiber service
- not_available
- Utilities · Distance to fiber
- 6.510 miles
- Environmental · Flood zone
- X
- Environmental · Inside 100-year floodplain
- No
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
Industrial-zoned, developed site in Pinal County with recorded entitlements and incentive zones, positioned for industrial operations that need existing permitting and rapid startup. The property already hosts a commercial structure and a registered EPA facility, includes on-site private well service, and lies within regional high-voltage transmission reach, easing utility coordination.
This location is best for heavy industrial, waste management, landfill support, or companies that need a permitted site with watershed and environmental controls in place. Rail corridors and I‑10 are within regional reach and a general aviation airfield is nearby, and local incentives and abatements reduce upfront cost and timeline for qualified users.